EZBilling
  • Features
  • Services
  • Packages
  • About
  • Blog
  • Contact
Log In Request Demo
Blog

Tag: #Unit-Price-Contracts

AIA Billing

Schedule of Values Best Practices: Lump-Sum vs Unit-Price Contracts

Lump-sum and unit-price contracts require different Schedule of Values structures. Here's how to set up your G703 correctly for each contrac...

8 min read • May 27, 2026
Recent Posts
  • Retainage Release Workflow: From Pending to Final Payment
    Aug 13, 2026
  • How One Mid-Size GC Stopped Losing Crews: A Labor Retention...
    Aug 6, 2026
  • Mobile Time Tracking for Field Labor: How to Choose the Righ...
    Jul 30, 2026
  • Balance Sheet Basics for GCs: WIP, Over/Under Billings, and...
    Jul 23, 2026
  • Subcontractor Default: Early Warning Signs and Contingency P...
    Jul 16, 2026
Categories
  • AIA Billing
  • Job Costing
  • Cash Flow
  • Compliance
  • Change Orders
  • Subcontractor Management
  • Accounting Basics
  • Technology
  • Industry Insights
Try EZBilling

AIA billing, job costing, and compliance tracking built for general contractors.

Start Free Trial
RSS Feed
EZBilling

Professional AIA billing and construction accounting software built specifically for general contractors.

Product
  • Features
  • Services
  • Packages
Company
  • About Us
  • Blog
  • Contact
Contact
  • sales@ezbilling.io
  • support@ezbilling.io

© 2026 EZBilling. All rights reserved.

Privacy Policy Terms of Service AI Disclosure

“AIA®” and “AIA Contract Documents®” are registered trademarks of The American Institute of Architects. EZBilling is not affiliated with, endorsed by, or sponsored by The American Institute of Architects. References to AIA document designations (e.g., G702, G703) are descriptive and used solely to identify the construction billing format with which EZBilling is compatible.